Ken Mattingly was moved from the assist crew into parallel coaching with Anders as backup CMP just in case Apollo 11 was delayed previous its supposed July launch day, at which point Anders can be unavailable.[59] The brand new layout Centre incorporates design and style, verification, and validation engineering https://pierref061dbz5.madmouseblog.com/profile